



Bill home page
Table Of Contents
Previous Fragment Next Fragment
Schedule 3 — Extension of controls on anti-fouling systems
Protection of the Sea (Harmful Anti-fouling Systems) Act 2006
1 Section 3 (definition of HAFC )
After “in an anti-fouling system”, insert “, or cybutryne”.
Insert:
pre-2023 exempt platform means an exempt platform that was constructed before 1 January 2023 and has not been in dry dock on or after that date.
3 At the end of section 4
Add:
; or (c) for a ship that has cybutryne applied on a designated external surface—neither of the following has occurred:
(i) the first scheduled renewal of the ship’s anti-fouling system after 1 January 2023;
(ii) the day that is 60 months after the last application of cybutryne to the ship before 1 January 2023.
4 Paragraph 9(1)(a)
Omit “on or after 1 January 2008,”.
5 After paragraph 9(1)(d)
Insert:
; and (e) for a ship that has cybutryne applied to a designated external surface—the ship is not a pre-2023 exempt platform.
6 Paragraph 9(2)(a)
Repeal the paragraph, substitute:
(a) a person allows an Australian ship to remain in a shipping facility; and
7 After paragraph 9(2)(d)
Insert:
and (e) for a ship that has cybutryne applied to a designated external surface—the ship is not a pre-2023 exempt platform;
8 Paragraph 9(3)(a)
Omit “on or after 1 January 2008,”.
9 After paragraph 9(3)(d)
Insert:
; and (e) for a ship that has cybutryne applied to a designated external surface—the ship is not a pre-2023 exempt platform.
10 Paragraph 9(4)(a)
Repeal the paragraph, substitute:
(a) a person allows a foreign ship to remain in an Australian shipping facility; and
11 After paragraph 9(4)(d)
Insert:
and (e) for a ship that has cybutryne applied to a designated external surface—the ship is not a pre-2023 exempt platform;
12 Paragraph 9(5)(a)
Omit “on or after 1 January 2008,”.
13 After paragraph 9(5)(d)
Insert:
; and (e) for a ship that has cybutryne applied to a designated external surface—the ship is not a pre-2023 exempt platform.
14 Paragraph 9(6)(a)
Repeal the paragraph, substitute:
(a) an Australian ship remains in a shipping facility; and
15 After paragraph 9(6)(c)
Insert:
and (d) for a ship that has cybutryne applied to a designated external surface—the ship is not a pre-2023 exempt platform;
16 Paragraph 9(7)(a)
Omit “on or after 1 January 2008,”.
17 After paragraph 9(7)(d)
Insert:
; and (e) for a ship that has cybutryne applied to a designated external surface—the ship is not a pre-2023 exempt platform.
18 Paragraph 9(8)(a)
Repeal the paragraph, substitute:
(a) a foreign ship remains in an Australian shipping facility; and
19 After paragraph 9(8)(c)
Insert:
and (d) for a ship that has cybutryne applied to a designated external surface—the ship is not a pre-2023 exempt platform;
20 Application of amendments
The amendments of subsections 9(2), (4), (6) and (8) of the Protection of the Sea (Harmful Anti-fouling Systems) Act 2006 made by this Schedule apply in relation to a ship whether or not the ship entered the shipping facility before the commencement of this Schedule.