Notice given 5 March 2012

1574  Senator Johnston: To ask the Minister representing the Minister for Defence—

(1) For the period 1 January to 31 December 2011, how many: (a) uniformed staff; and (b) civilian staff, resigned from each of the service areas (i.e. army, navy and air force).

(2) For the period 1 January to 31 December 2011, how many: (a) uniformed staff; and (b) civilian staff, were made redundant or accepted severance packages in each of the service areas.

1621  Senator Johnston: To ask the Minister representing the Minister for Defence—As at 31 December 2011:

(1) With reference to the acquisition of the first 2 F-35 Joint Strike Fighter (JSF) aircraft: (a) what is the expected expenditure on the acquisition; and (b) what is to be supplied as equipment, supporting systems, weapons, services or infrastructure to the Australian Defence Force (ADF).

(2) With reference to the acquisition of a further 12  F-35 JSF aircraft: (a) what is the expected expenditure on the acquisition; and (b) what is to be supplied as equipment, supporting systems, weapons, services or infrastructure to the ADF.

(3) When will these first 14 F-35 JSF aircraft: (a) be delivered; (b) become fully operational; and (c) what is the estimated through-life support and operating costs for these aircraft over an expected 30 year period of operation.

(4) When will the remaining 86 F-35 JSF be purchased (as referenced in the Defence White Paper 2009 , p. 78, paragraph 9.60, ‘The Government has decided that it will acquire around 100 F-35 JSF, along with supporting systems and weapons. The first stage of this acquisition will acquire three operational squadrons comprising not fewer than 72 aircraft’).

(5) With reference to the acquisition of the remaining 86 F-35 JSF aircraft: (a) what is the expected expenditure on the acquisition; (b) what will be supplied as equipment, supporting systems, weapons, services or infrastructure to the ADF; (c) when will the aircraft be delivered; (d) when will they become fully operational; (e) where will the JSF squadrons be based, and when; and (e) what is the estimated through-life support and operating costs over an expected 30 year period of operation.

(6) What savings would be made by cancelling the purchase of 24 F-35 JSF aircraft and purchasing 24 Super Hornets.

1623  Senator Johnston: To ask the Minister representing the Minister for Defence—With reference to the Government commissioned report, 2008 Audit of the Defence Budget which identified that ‘a real growth rate of 3.5% in capital expenditure on SME [Specialised Military Equipment] [is required] just to replace today’s equipment. To deliver the capabilities proposed in the recommended Force Structure Option requires a growth rate of 4.2%’: As at 31 December 2011, what will be the amount required to fund, in nominal dollars, the major capital equipment program each year from 2010-11 to 2029-30, so as to fund the White Paper ‘Force 2030’ initiatives.

 

 1631  Senator Johnston: To ask the Minister representing the Minister for Defence—As at 31 December 2011:

(1) From which areas of expenditure will the enhanced force protection measures be made.

(2) What specific programs will be cut or deferred to meet this cost.

(3) Why did the Government cease disclosing deferrals in expenditure in the 2008-09 Budget which has continued through to the 2011-12 Budget.

(4) (a) What are the specific deferrals in expenditure since 2008-09; and (b) why have these deferrals been made.

(5) What percentage increase, if any, will be made to enable future capital equipment initiatives over the forward estimates period.

(6) As it is not clear in the 2011-12 Budget, what specific projects are planned for approval in 2011-12.

(7) (a) What programs in 2011-12 will now have to be resourced through absorbed costs; and (b) what programs have been cancelled or deferred to enable these costs to be absorbed.

(8) Of the $20.6 billion worth of savings under the Strategic Reform Program (SRP) it would appear that $4.6 billion of this involves the re-allocation of funds and is not a savings item at all - how can this claim of savings be made when it is in fact a reallocation of funds.

(9) Under the SRP: (a) why has the number of civilian employees to be cut been reduced from the forecast 3 125; and (b) what is the new figure.

1634  Senator Johnston: To ask the Minister representing the Minister for Defence Materiel—With reference to the major project Tactical Information Exchange Domain JP 2089, can the following details be provided:

(a) the date that the project was first proposed to Government as a major capital equipment initiative;

(b) the date of the first estimated date, time period, for first pass approval, as per the Defence Capability Plan (DCP), or when it was first proposed to Government;

(c) the date of the first estimated date, time period, for second pass approval, as per the DCP, or when it was first proposed to Government;

(d) the date of first pass approval;

(e) the date of second pass approval;

(f) the estimated acquisition cost when first proposed to Government;

(g) the amount spent to date on this project;

(h) the current estimated acquisition cost;

(i) the date of estimated initial operational capability when first proposed to Government;

(j) the current date of estimated initial operational capability; and

(k) the reason(s) for the delay in this project, if applicable.

1635  Senator Johnston: To ask the Minister representing the Minister for Defence Materiel—With reference to the major project Active Missile Decoy (AMD) SEA 1229 Phase 1, 2 and 3, can the following details be provided:

(a) the date that the project was first proposed to Government as a major capital equipment initiative;

 

 (b) the date of the first estimated date, time period, for first pass approval, as per the Defence Capability Plan (DCP), or when it was first proposed to Government;

(c) the date of the first estimated date, time period, for second pass approval, as per the DCP, or when it was first proposed to Government;

(d) the date of first pass approval;

(e) the date of second pass approval;

(f) the estimated acquisition cost when first proposed to Government;

(g) the amount spent to date on this project;

(h) the current estimated acquisition cost;

(i) the date of estimated initial operational capability when first proposed to Government;

(j) the current date of estimated initial operational capability; and

(k) the reason(s) for the delay in this project, if applicable.

1636  Senator Johnston: To ask the Minister representing the Minister for Defence Materiel—With reference to the major project Anzac Ships SEA 1348 Phase 2, can the following details be provided:

(a) the date that the project was first proposed to Government as a major capital equipment initiative;

(b) the date of the first estimated date, time period, for first pass approval, as per the Defence Capability Plan (DCP), or when it was first proposed to Government;

(c) the date of the first estimated date, time period, for second pass approval, as per the DCP, or when it was first proposed to Government;

(d) the date of first pass approval;

(e) the date of second pass approval;

(f) the estimated acquisition cost when first proposed to Government;

(g) the amount spent to date on this project;

(h) the current estimated acquisition cost;

(i) the date of estimated initial operational capability when first proposed to Government;

(j) the current date of estimated initial operational capability; and

(k) the reason(s) for the delay in this project, if applicable.

1637  Senator Johnston: To ask the Minister representing the Minister for Defence Materiel—With reference to the major project Anzac Ship Project - Underwater and Surface War Fighting Upgrade Pgm SEA 1348 Phase 3, can the following details be provided:

(a) the date that the project was first proposed to Government as a major capital equipment initiative;

(b) the date of the first estimated date, time period, for first pass approval, as per the Defence Capability Plan (DCP), or when it was first proposed to Government;

(c) the date of the first estimated date, time period, for second pass approval, as per the DCP, or when it was first proposed to Government;

(d) the date of first pass approval;

 

 (e) the date of second pass approval;

(f) the estimated acquisition cost when first proposed to Government;

(g) the amount spent to date on this project;

(h) the current estimated acquisition cost;

(i) the date of estimated initial operational capability when first proposed to Government;

(j) the current date of estimated initial operational capability; and

(k) the reason(s) for the delay in this project, if applicable.

1638  Senator Johnston: To ask the Minister representing the Minister for Defence Materiel—With reference to the major project Guided Missile Frigate Upgrade Implementation SEA 1390 Phase 2.1, can the following details be provided:

(a) the date that the project was first proposed to Government as a major capital equipment initiative;

(b) the date of the first estimated date, time period, for first pass approval, as per the Defence Capability Plan (DCP), or when it was first proposed to Government;

(c) the date of the first estimated date, time period, for second pass approval, as per the DCP, or when it was first proposed to Government;

(d) the date of first pass approval;

(e) the date of second pass approval;

(f) the estimated acquisition cost when first proposed to Government;

(g) the amount spent to date on this project;

(h) the current estimated acquisition cost;

(i) the date of estimated initial operational capability when first proposed to Government;

(j) the current date of estimated initial operational capability; and

(k) the reason(s) for the delay in this project, if applicable.

1639  Senator Johnston: To ask the Minister representing the Minister for Defence Materiel—With reference to the major project Standard Missile Replacement SEA 1390 Phase 4, can the following details be provided:

(a) the date that the project was first proposed to Government as a major capital equipment initiative;

(b) the date of the first estimated date, time period, for first pass approval, as per the Defence Capability Plan (DCP), or when it was first proposed to Government;

(c) the date of the first estimated date, time period, for second pass approval, as per the DCP, or when it was first proposed to Government;

(d) the date of first pass approval;

(e) the date of second pass approval;

(f) the estimated acquisition cost when first proposed to Government;

(g) the amount spent to date on this project;

(h) the current estimated acquisition cost;

(i) the date of estimated initial operational capability when first proposed to Government;

 

 (j) the current date of estimated initial operational capability; and

(k) the reason(s) for the delay in this project, if applicable.

1640  Senator Johnston: To ask the Minister representing the Minister for Defence Materiel—With reference to the major project NULKA SEA 1397, can the following details be provided:

(a) the date that the project was first proposed to Government as a major capital equipment initiative;

(b) the date of the first estimated date, time period, for first pass approval, as per the Defence Capability Plan (DCP), or when it was first proposed to Government;

(c) the date of the first estimated date, time period, for second pass approval, as per the DCP, or when it was first proposed to Government;

(d) the date of first pass approval;

(e) the date of second pass approval;

(f) the estimated acquisition cost when first proposed to Government;

(g) the amount spent to date on this project;

(h) the current estimated acquisition cost;

(i) the date of estimated initial operational capability when first proposed to Government;

(j) the current date of estimated initial operational capability; and

(k) the reason(s) for the delay in this project, if applicable.

1641  Senator Johnston: To ask the Minister representing the Minister for Defence Materiel—With reference to the major project FLIR and ESM for S-70B-2 Helicopters SEA 1405, can the following details be provided:

(a) the date that the project was first proposed to Government as a major capital equipment initiative;

(b) the date of the first estimated date, time period, for first pass approval, as per the Defence Capability Plan (DCP), or when it was first proposed to Government;

(c) the date of the first estimated date, time period, for second pass approval, as per the DCP, or when it was first proposed to Government;

(d) the date of first pass approval;

(e) the date of second pass approval;

(f) the estimated acquisition cost when first proposed to Government;

(g) the amount spent to date on this project;

(h) the current estimated acquisition cost;

(i) the date of estimated initial operational capability when first proposed to Government;

(j) the current date of estimated initial operational capability; and

(k) the reason(s) for the delay in this project, if applicable.

1642  Senator Johnston: To ask the Minister representing the Minister for Defence Materiel—With reference to the major project Evolved SEASPARROW SEA 1428, can the following details be provided:

(a) the date that the project was first proposed to Government as a major capital equipment initiative;

 

 (b) the date of the first estimated date, time period, for first pass approval, as per the Defence Capability Plan (DCP), or when it was first proposed to Government;

(c) the date of the first estimated date, time period, for second pass approval, as per the DCP, or when it was first proposed to Government;

(d) the date of first pass approval;

(e) the date of second pass approval;

(f) the estimated acquisition cost when first proposed to Government;

(g) the amount spent to date on this project;

(h) the current estimated acquisition cost;

(i) the date of estimated initial operational capability when first proposed to Government;

(j) the current date of estimated initial operational capability; and

(k) the reason(s) for the delay in this project, if applicable.

1643  Senator Johnston: To ask the Minister representing the Minister for Defence Materiel—With reference to the major project Replacement Heavyweight Torpedo SEA 1429, can the following details be provided:

(a) the date that the project was first proposed to Government as a major capital equipment initiative;

(b) the date of the first estimated date, time period, for first pass approval, as per the Defence Capability Plan (DCP), or when it was first proposed to Government;

(c) the date of the first estimated date, time period, for second pass approval, as per the DCP, or when it was first proposed to Government;

(d) the date of first pass approval;

(e) the date of second pass approval;

(f) the estimated acquisition cost when first proposed to Government;

(g) the amount spent to date on this project;

(h) the current estimated acquisition cost;

(i) the date of estimated initial operational capability when first proposed to Government;

(j) the current date of estimated initial operational capability; and

(k) the reason(s) for the delay in this project, if applicable.

1644  Senator Johnston: To ask the Minister representing the Minister for Defence Materiel—With reference to the major project COLLINS Class Replacement Combat System SEA 1439 Phase 4A, can the following details be provided:

(a) the date that the project was first proposed to Government as a major capital equipment initiative;

(b) the date of the first estimated date, time period, for first pass approval, as per the Defence Capability Plan (DCP), or when it was first proposed to Government;

(c) the date of the first estimated date, time period, for second pass approval, as per the DCP, or when it was first proposed to Government;

(d) the date of first pass approval;

(e) the date of second pass approval;

 

 (f) the estimated acquisition cost when first proposed to Government;

(g) the amount spent to date on this project;

(h) the current estimated acquisition cost;

(i) the date of estimated initial operational capability when first proposed to Government;

(j) the current date of estimated initial operational capability; and

(k) the reason(s) for the delay in this project, if applicable.

1645  Senator Johnston: To ask the Minister representing the Minister for Defence Materiel—With reference to the major project Maritime Communications Modernisation SEA 1442, can the following details be provided:

(a) the date that the project was first proposed to Government as a major capital equipment initiative;

(b) the date of the first estimated date, time period, for first pass approval, as per the Defence Capability Plan (DCP), or when it was first proposed to Government;

(c) the date of the first estimated date, time period, for second pass approval, as per the DCP, or when it was first proposed to Government;

(d) the date of first pass approval;

(e) the date of second pass approval;

(f) the estimated acquisition cost when first proposed to Government;

(g) the amount spent to date on this project;

(h) the current estimated acquisition cost;

(i) the date of estimated initial operational capability when first proposed to Government;

(j) the current date of estimated initial operational capability; and

(k) the reason(s) for the delay in this project, if applicable.

1646  Senator Johnston: To ask the Minister representing the Minister for Defence Materiel—With reference to the major project Armidale Class Patrol Boat Project SEA 1444, can the following details be provided:

(a) the date that the project was first proposed to Government as a major capital equipment initiative;

(b) the date of the first estimated date, time period, for first pass approval, as per the Defence Capability Plan (DCP), or when it was first proposed to Government;

(c) the date of the first estimated date, time period, for second pass approval, as per the DCP, or when it was first proposed to Government;

(d) the date of first pass approval;

(e) the date of second pass approval;

(f) the estimated acquisition cost when first proposed to Government;

(g) the amount spent to date on this project;

(h) the current estimated acquisition cost;

(i) the date of estimated initial operational capability when first proposed to Government;

(j) the current date of estimated initial operational capability; and

(k) the reason(s) for the delay in this project, if applicable.

 

 1647  Senator Johnston: To ask the Minister representing the Minister for Defence Materiel—With reference to the major project ANZAC Anti-Ship Missile Defence SEA 1448, can the following details be provided:

(a) the date that the project was first proposed to Government as a major capital equipment initiative;

(b) the date of the first estimated date, time period, for first pass approval, as per the Defence Capability Plan (DCP), or when it was first proposed to Government;

(c) the date of the first estimated date, time period, for second pass approval, as per the DCP, or when it was first proposed to Government;

(d) the date of first pass approval;

(e) the date of second pass approval;

(f) the estimated acquisition cost when first proposed to Government;

(g) the amount spent to date on this project;

(h) the current estimated acquisition cost;

(i) the date of estimated initial operational capability when first proposed to Government;

(j) the current date of estimated initial operational capability; and

(k) the reason(s) for the delay in this project, if applicable.

1648  Senator Johnston: To ask the Minister representing the Minister for Defence Materiel—With reference to the major project Replacement of Afloat Support Capability SEA 1654, can the following details be provided:

(a) the date that the project was first proposed to Government as a major capital equipment initiative;

(b) the date of the first estimated date, time period, for first pass approval, as per the Defence Capability Plan (DCP), or when it was first proposed to Government;

(c) the date of the first estimated date, time period, for second pass approval, as per the DCP, or when it was first proposed to Government;

(d) the date of first pass approval;

(e) the date of second pass approval;

(f) the estimated acquisition cost when first proposed to Government;

(g) the amount spent to date on this project;

(h) the current estimated acquisition cost;

(i) the date of estimated initial operational capability when first proposed to Government;

(j) the current date of estimated initial operational capability; and

(k) the reason(s) for the delay in this project, if applicable.

1649  Senator Johnston: To ask the Minister representing the Minister for Defence Materiel—With reference to the major project Air Warfare Destroyer SEA 4000, can the following details be provided:

(a) the date that the project was first proposed to Government as a major capital equipment initiative;

 

 (b) the date of the first estimated date, time period, for first pass approval, as per the Defence Capability Plan (DCP), or when it was first proposed to Government;

(c) the date of the first estimated date, time period, for second pass approval, as per the DCP, or when it was first proposed to Government;

(d) the date of first pass approval;

(e) the date of second pass approval;

(f) the estimated acquisition cost when first proposed to Government;

(g) the amount spent to date on this project;

(h) the current estimated acquisition cost;

(i) the date of estimated initial operational capability when first proposed to Government;

(j) the current date of estimated initial operational capability; and

(k) the reason(s) for the delay in this project, if applicable.

1650  Senator Johnston: To ask the Minister representing the Minister for Defence Materiel—With reference to the major project Airborne Early Warning and Control Aircraft AIR 5077, can the following details be provided:

(a) the date that the project was first proposed to Government as a major capital equipment initiative;

(b) the date of the first estimated date, time period, for first pass approval, as per the Defence Capability Plan (DCP), or when it was first proposed to Government;

(c) the date of the first estimated date, time period, for second pass approval, as per the DCP, or when it was first proposed to Government;

(d) the date of first pass approval;

(e) the date of second pass approval;

(f) the estimated acquisition cost when first proposed to Government;

(g) the amount spent to date on this project;

(h) the current estimated acquisition cost;

(i) the date of estimated initial operational capability when first proposed to Government;

(j) the current date of estimated initial operational capability; and

(k) the reason(s) for the delay in this project, if applicable.

1651  Senator Johnston: To ask the Minister representing the Minister for Defence Materiel—With reference to the major project New Air Defence Command and Control Systems for Control Units 2 and 3 AIR 5333, can the following details be provided:

(a) the date that the project was first proposed to Government as a major capital equipment initiative;

(b) the date of the first estimated date, time period, for first pass approval, as per the Defence Capability Plan (DCP), or when it was first proposed to Government;

(c) the date of the first estimated date, time period, for second pass approval, as per the DCP, or when it was first proposed to Government;

(d) the date of first pass approval;

 

 (e) the date of second pass approval;

(f) the estimated acquisition cost when first proposed to Government;

(g) the amount spent to date on this project;

(h) the current estimated acquisition cost;

(i) the date of estimated initial operational capability when first proposed to Government;

(j) the current date of estimated initial operational capability; and

(k) the reason(s) for the delay in this project, if applicable.

1652  Senator Johnston: To ask the Minister representing the Minister for Defence Materiel—With reference to the major project Bridging Air Combat Capability AIR 5349 Phase 2, can the following details be provided:

(a) the date that the project was first proposed to Government as a major capital equipment initiative;

(b) the date of the first estimated date, time period, for first pass approval, as per the Defence Capability Plan (DCP), or when it was first proposed to Government;

(c) the date of the first estimated date, time period, for second pass approval, as per the DCP, or when it was first proposed to Government;

(d) the date of first pass approval;

(e) the date of second pass approval;

(f) the estimated acquisition cost when first proposed to Government;

(g) the amount spent to date on this project;

(h) the current estimated acquisition cost;

(i) the date of estimated initial operational capability when first proposed to Government;

(j) the current date of estimated initial operational capability; and

(k) the reason(s) for the delay in this project, if applicable.

1653  Senator Johnston: To ask the Minister representing the Minister for Defence Materiel—With reference to the major project Bridging Air Combat Capability AIR 5349 Phase 1, can the following details be provided:

(a) the date that the project was first proposed to Government as a major capital equipment initiative;

(b) the date of the first estimated date, time period, for first pass approval, as per the Defence Capability Plan (DCP), or when it was first proposed to Government;

(c) the date of the first estimated date, time period, for second pass approval, as per the DCP, or when it was first proposed to Government;

(d) the date of first pass approval;

(e) the date of second pass approval;

(f) the estimated acquisition cost when first proposed to Government;

(g) the amount spent to date on this project;

(h) the current estimated acquisition cost;

(i) the date of estimated initial operational capability when first proposed to Government;

 

 (j) the current date of estimated initial operational capability; and

(k) the reason(s) for the delay in this project, if applicable.

1654  Senator Johnston: To ask the Minister representing the Minister for Defence Materiel—With reference to the major project F/A-18 Hornet Upgrade AIR 5376, can the following details be provided:

(a) the date that the project was first proposed to Government as a major capital equipment initiative;

(b) the date of the first estimated date, time period, for first pass approval, as per the Defence Capability Plan (DCP), or when it was first proposed to Government;

(c) the date of the first estimated date, time period, for second pass approval, as per the DCP, or when it was first proposed to Government;

(d) the date of first pass approval;

(e) the date of second pass approval;

(f) the estimated acquisition cost when first proposed to Government;

(g) the amount spent to date on this project;

(h) the current estimated acquisition cost;

(i) the date of estimated initial operational capability when first proposed to Government;

(j) the current date of estimated initial operational capability; and

(k) the reason(s) for the delay in this project, if applicable.

1655  Senator Johnston: To ask the Minister representing the Minister for Defence Materiel—With reference to the major project Air to Air Refuelling Capability AIR 5402, can the following details be provided:

(a) the date that the project was first proposed to Government as a major capital equipment initiative;

(b) the date of the first estimated date, time period, for first pass approval, as per the Defence Capability Plan (DCP), or when it was first proposed to Government;

(c) the date of the first estimated date, time period, for second pass approval, as per the DCP, or when it was first proposed to Government;

(d) the date of first pass approval;

(e) the date of second pass approval;

(f) the estimated acquisition cost when first proposed to Government;

(g) the amount spent to date on this project;

(h) the current estimated acquisition cost;

(i) the date of estimated initial operational capability when first proposed to Government;

(j) the current date of estimated initial operational capability; and

(k) the reason(s) for the delay in this project, if applicable.

1656  Senator Johnston: To ask the Minister representing the Minister for Defence Materiel—With reference to the major project Project Echidna Electronic Warfare Self Protection for ADF Aircraft AIR 5416, can the following details be provided:

(a) the date that the project was first proposed to Government as a major capital equipment initiative;

 

 (b) the date of the first estimated date, time period, for first pass approval, as per the Defence Capability Plan (DCP), or when it was first proposed to Government;

(c) the date of the first estimated date, time period, for second pass approval, as per the DCP, or when it was first proposed to Government;

(d) the date of first pass approval;

(e) the date of second pass approval;

(f) the estimated acquisition cost when first proposed to Government;

(g) the amount spent to date on this project;

(h) the current estimated acquisition cost;

(i) the date of estimated initial operational capability when first proposed to Government;

(j) the current date of estimated initial operational capability; and

(k) the reason(s) for the delay in this project, if applicable.

1657  Senator Johnston: To ask the Minister representing the Minister for Defence Materiel—With reference to the major project Follow-on Standoff Weapon AIR 5418, can the following details be provided:

(a) the date that the project was first proposed to Government as a major capital equipment initiative;

(b) the date of the first estimated date, time period, for first pass approval, as per the Defence Capability Plan (DCP), or when it was first proposed to Government;

(c) the date of the first estimated date, time period, for second pass approval, as per the DCP, or when it was first proposed to Government;

(d) the date of first pass approval;

(e) the date of second pass approval;

(f) the estimated acquisition cost when first proposed to Government;

(g) the amount spent to date on this project;

(h) the current estimated acquisition cost;

(i) the date of estimated initial operational capability when first proposed to Government;

(j) the current date of estimated initial operational capability; and

(k) the reason(s) for the delay in this project, if applicable.

1658  Senator Johnston: To ask the Minister representing the Minister for Defence Materiel—With reference to the major project Joint Strike Fighter Aircraft AIR 6000, can the following details be provided:

(a) the date that the project was first proposed to Government as a major capital equipment initiative;

(b) the date of the first estimated date, time period, for first pass approval, as per the Defence Capability Plan (DCP), or when it was first proposed to Government;

(c) the date of the first estimated date, time period, for second pass approval, as per the DCP, or when it was first proposed to Government;

(d) the date of first pass approval;

(e) the date of second pass approval;

 

 (f) the estimated acquisition cost when first proposed to Government;

(g) the amount spent to date on this project;

(h) the current estimated acquisition cost;

(i) the date of estimated initial operational capability when first proposed to Government;

(j) the current date of estimated initial operational capability; and

(k) the reason(s) for the delay in this project, if applicable.

1659  Senator Johnston: To ask the Minister representing the Minister for Defence Materiel—With reference to the major project AIR 7000: Phase 1B and 2B AIR 7000, can the following details be provided:

(a) the date that the project was first proposed to Government as a major capital equipment initiative;

(b) the date of the first estimated date, time period, for first pass approval, as per the Defence Capability Plan (DCP), or when it was first proposed to Government;

(c) the date of the first estimated date, time period, for second pass approval, as per the DCP, or when it was first proposed to Government;

(d) the date of first pass approval;

(e) the date of second pass approval;

(f) the estimated acquisition cost when first proposed to Government;

(g) the amount spent to date on this project;

(h) the current estimated acquisition cost;

(i) the date of estimated initial operational capability when first proposed to Government;

(j) the current date of estimated initial operational capability; and

(k) the reason(s) for the delay in this project, if applicable.

1660  Senator Johnston: To ask the Minister representing the Minister for Defence Materiel—With reference to the major project C-17 Globemaster III AIR 8000, can the following details be provided:

(a) the date that the project was first proposed to Government as a major capital equipment initiative;

(b) the date of the first estimated date, time period, for first pass approval, as per the Defence Capability Plan (DCP), or when it was first proposed to Government;

(c) the date of the first estimated date, time period, for second pass approval, as per the DCP, or when it was first proposed to Government;

(d) the date of first pass approval;

(e) the date of second pass approval;

(f) the estimated acquisition cost when first proposed to Government;

(g) the amount spent to date on this project;

(h) the current estimated acquisition cost;

(i) the date of estimated initial operational capability when first proposed to Government;

(j) the current date of estimated initial operational capability; and

(k) the reason(s) for the delay in this project, if applicable.

 

 1661  Senator Johnston: To ask the Minister representing the Minister for Defence Materiel—With reference to the major project Armed Reconnaissance Helicopter AIR 87, can the following details be provided:

(a) the date that the project was first proposed to Government as a major capital equipment initiative;

(b) the date of the first estimated date, time period, for first pass approval, as per the Defence Capability Plan (DCP), or when it was first proposed to Government;

(c) the date of the first estimated date, time period, for second pass approval, as per the DCP, or when it was first proposed to Government;

(d) the date of first pass approval;

(e) the date of second pass approval;

(f) the estimated acquisition cost when first proposed to Government;

(g) the amount spent to date on this project;

(h) the current estimated acquisition cost;

(i) the date of estimated initial operational capability when first proposed to Government;

(j) the current date of estimated initial operational capability; and

(k) the reason(s) for the delay in this project, if applicable.

1662  Senator Johnston: To ask the Minister representing the Minister for Defence Materiel—With reference to the major project Multi Role Helicopter AIR 9000 Phase 2, can the following details be provided:

(a) the date that the project was first proposed to Government as a major capital equipment initiative;

(b) the date of the first estimated date, time period, for first pass approval, as per the Defence Capability Plan (DCP), or when it was first proposed to Government;

(c) the date of the first estimated date, time period, for second pass approval, as per the DCP, or when it was first proposed to Government;

(d) the date of first pass approval;

(e) the date of second pass approval;

(f) the estimated acquisition cost when first proposed to Government;

(g) the amount spent to date on this project;

(h) the current estimated acquisition cost;

(i) the date of estimated initial operational capability when first proposed to Government;

(j) the current date of estimated initial operational capability; and

(k) the reason(s) for the delay in this project, if applicable.

1663  Senator Johnston: To ask the Minister representing the Minister for Defence Materiel—With reference to the major project MH-60R Seahawk Romeo AIR 9000 Phase 8, can the following details be provided:

(a) the date that the project was first proposed to Government as a major capital equipment initiative;

 

 (b) the date of the first estimated date, time period, for first pass approval, as per the Defence Capability Plan (DCP), or when it was first proposed to Government;

(c) the date of the first estimated date, time period, for second pass approval, as per the DCP, or when it was first proposed to Government;

(d) the date of first pass approval;

(e) the date of second pass approval;

(f) the estimated acquisition cost when first proposed to Government;

(g) the amount spent to date on this project;

(h) the current estimated acquisition cost;

(i) the date of estimated initial operational capability when first proposed to Government;

(j) the current date of estimated initial operational capability; and

(k) the reason(s) for the delay in this project, if applicable.