Senator Bob Brown asked the President of the Senate, upon notice, on 15 March 2010:

(1)   What has been the nature and cost of all road work on Parliament Drive since (and including) when it was made one-way in 2006, and can an itemised list of the works be provided including a cost and rationale for each item.

(2)   With reference to current works on the public car park at Parliament House: (a) how many spaces were available for cars, motorcycles and bicycles before work commenced; and (b) how many spaces will there be once work is completed.


The President —The answer to the honourable senator’s question is as follows:

(1)   Roads works around Parliament Drive between 2005 and 2010 cost $2.05 million (administered capital funding) comprising:

Parliament Drive Works

2005 to 2010

Cost

When

Purpose

Initial one way road conversion

$100,000

2006

Conversion to one way road to eliminate conflicts near Senate and House of Representatives slip roads arising from the installation of slip road bollards.

Consultant studies

$50,000

2006 and 2007

Post-Operative Review and Traffic Management Report (Road Safety Assessment).

Current works

$1.9 million

2009/10

Implementing road safety recommendations from the Traffic Management Report and re-surfacing the road.

(2)   Spaces in the public car park at Parliament House:

Parking Category

Existing (Pre changes to car park)

New

Net Change

Inside Restricted Area adjacent to Security Point One and the lift

0

12

+12

Disabled

10

10

0

Loading Zone

4

8

+4

Official Vehicles

4

8

+4

Large Coaches (9-14.5m)

10

8

-2

Smaller Coaches / Motor Homes (Under 9m)

10

14

+4

Taxi

4

6

+2

Drop-off area

2

2

0

Cars—

Existing central area before changes

322

Reduced central area parking after reorganisation on 22 March 2010.

233

Diagonal parking on the large driveways/roadways on the East and West sides of the car park is expected to provide 100 additional spaces. This will be subject to a traffic management study currently underway. Note: About 50 additional spaces will be available from 22 March 2010, with the remaining 50 spaces available once concrete kerbs are removed by late May 2010.

100

Total Spaces (new layout)

333

+11

Motor Cycle

10

10

0

Bicycle Stands

16

16

0